Installation cabinet:
You need to do the following three things yourself: first, use the screws and nuts of the random frame belt to tighten the fixing frame; Second, knock down the cabinet and put movable wheels on it. Third, adjust and add baffles on the fixed frame according to the position of the equipment.
Cleaning the line:
The network cable group, the number of groups is usually less than or equal to the number of line frame behind the cabinet. Tie the power cords of all the devices together, insert the plug through the wire hole at the back, and find the respective device through a separate wire arrangement rack.
Fixed equipment:
Adjust the baffle in the cabinet to the appropriate position, so that the administrator can see the operation of all the equipment without opening the cabinet door, and add baffle appropriately according to the number and size of the equipment. Be careful to leave some space between the baffles. All the switching equipment and routing equipment used in the cabinet shall be placed according to the pre-drawn drawings.
Network cable labeling:
After all the network cables are connected, all the network cables need to be marked. Wrap the prepared Post-it Notes on the network cables and mark them with a pen (generally indicate the room number or what purpose they are used for). The marks are required to be simple and easy to understand. The cross network cable can be distinguished from the general network cable by the use of different color Post-it Notes. If there are too many devices, they should be classified and numbered, and labeled.